Driveways in Humboldt and Trinity County
Humboldt Bay Construction Co. builds driveways across Humboldt and Trinity County as part of its dirt work. In Humboldt County, encroachment permits for work in the right of way of a county-maintained road come from Public Works, whose encroachment permit office also checks that new driveway locations meet county standards.

Dirt work
“We do it all.”
Where a driveway meets a county road
In Humboldt County, encroachment permits for work in the right of way of a county-maintained road come from Public Works, whose encroachment permit office also checks that new driveway locations meet county standards.
County policy requires a paved entrance where a driveway meets a paved county road.
The county asks applicants to allow three weeks for an encroachment permit to be processed and issued.
Sources: Humboldt County: Real Property & Right of Way; Humboldt County: Public Works; Humboldt County: Instructions for Completing the Encroachment Permit Application
Long driveways and erosion control
Under Humboldt County Code §331-14, a site-specific erosion and sediment control plan has to be submitted with any development application involving grading that has any one of these characteristics: it covers one acre or more; it is on a slope of 15 percent or steeper; it is in an area of moderate or high geologic instability; it is within a Streamside Management Area or other wet area; it is within a floodplain; it is for a driveway or road longer than 300 feet; or it is planned for the winter period, October 15 to April 15.
The Chief Building Official may also require a plan, prepared by a qualified professional at the owner's expense, at any time during design or construction.
Source: Humboldt County Code §331-14 (grading, excavation, erosion and sediment control)
Rain and wet ground
Eureka averages 40.4 inches of rain a year, and 77 percent of it falls from November through March (NOAA, 1991-2020 normals).
Source: NOAA National Centers for Environmental Information, 1991-2020 normals: Eureka (Woodley Island)
Last checked against the sources:
Page last updated:
Questions
Does grading need a permit in Humboldt County?
Unless the work is exempt, no one may grade in unincorporated Humboldt County without a grading permit from the county's Building Official. The work that needs no grading permit, and where those exemptions do not apply, is listed in Humboldt County Code §331-14(d)(2) and (d)(3).
When does Humboldt County ask for a grading plan?
For a house in unincorporated Humboldt County, the county asks for a grading plan when the grading is 50 cubic yards or more (not counting the foundation excavation), or when the job triggers the county grading ordinance in any other way.
What is the winter period under the county's grading ordinance?
The county's grading ordinance treats October 15 through April 15 as the winter period. On projects that need a building, grading or development permit, bare ground has to be seeded and mulched before October 15, unless the project's conditions say otherwise.
Sources: Humboldt County Code §331-14 (grading, excavation, erosion and sediment control); Humboldt County: Residential (Standard) construction documents
Request an estimate
Tell us about the job
Tell us what you need done and where.
Or give Kyler a call: (707) 273-7594